Client: Shell
Other Partners:
28.5% BP
Details:
Fixed platform, gathering hub for Shell's Ursa & Mensa
354feet (108meters) water depth
Project Team:
Project Associates, Inc. (Engineering)
W.S. Nelson (Engineering)
Unifab (Shipyard)
J.Ray McDermott (Shipyard)
Installation:
Houma and Amelia, LA USA (onshore)
West Delta 143 (offshore)
FIBERBOND® Scope:
Supply of materials
Shop prefabrication
Site installation including FRP welding
Installation of supports, installation of flanges, and commissioning assistance
Systems Selected for FIBERBOND®:
Firewater, seawater, freshwater, open drain system
4,084feet (1,245meters) of piping, up to 8" (200NB)
ABS-type approved products
200psig (13.8bar) design, 300psig (20.7bar) hydrotest
Highlights:
Installed warranty on entire system
Included expansion for Shell's Ursa and Mensa projects
Operating since 1996