Client:
Shell
Other Partners:
31% BP, 31% ExxonMobil
Details:
Tension Leg Platform
3,300feet (1,005meters) water depth
5 deck modules
Project Team:
W.H. Linder & Associates (Engineering)
J. Ray McDermott (Shipyard)
Bay, Ltd (Piping Subcontractor)
Installation:
Amelia, LA USA (onshore)
Viosca Knoll 956 (offshore)
FIBERBOND® Scope:
Supply of materials
Shop prefabrication
Site installation including FRP welding
Installation of supports, installation of flanges, and commissioning assistance
Installed warranty on entire system
Systems Selected for FIBERBOND®:
Firewater, seawater, waterflood
2,000feet (210meters) of piping, up to 12" (300NB)
200psig (13.8bar) design, 300psig (20.7bar) hydrotest
ABS- and USCG-type approved products.
Highlights:
FIBERBOND® selected after good performance on Mars
Applications extended to waterflood and seawater systems
Operating since 1996