Client:
Shell Deepwater
Other Partners:
28.5% BP
Details:
Tension Leg Platform
3,250feet (990meters) water depth
5 deck modules
Project Team:
W.H. Linder & Associates (Engineering)
J. Ray McDermott (Shipyard)
Bay, Ltd (Piping Subcontractor)
Aker Gulf Marine (Module Integration)
Installation:
Amelia, LA USA (onshore)
Ingleside, TX USA (module integration)
Mississippi Canyon 807A (offshore)
FIBERBOND® Scope:
Supply of materials
Shop prefabrication
Site installation including FRP welding
Installation of supports, installation of flanges, and commissioning assistance
Systems Selected for FIBERBOND®:
Firewater, seawater, waterflood,
sodium hypochlorite supply, drill water overboard
3,200feet (975meters) of piping, up to 16" (400NB)
ABS- and USCG-type approved products
200psig (13.8bar) design, 300psig (20.7bar) hydrotest
Highlights:
FIBERBOND® selected after poor performance with Bondstrand on "Auger"
Installed warranty on entire system
Operating since 1995