Client: Shell
Other Partners:
25% Amerada Hess, 20% Devon Energy
Details:
2-piece fixed platform
633feet (193meters) water depth
Project Team:
Alliance Engineering (Engineering)
Gulf Island Fabrication (Shipyard)
Installation:
Houma, LA USA (onshore)
Garden Banks 128 (offshore)
FIBERBOND® Scope:
Supply of materials
Shop prefabrication
Site installation including FRP welding
Installation of supports, installation of flanges, and commissioning assistance
Systems Selected for FIBERBOND®:
Firewater, seawater
740feet (225meters) of piping, up to 6" (150NB)
ABS-type approved products
200psig (13.8bar) design, 300psig (20.7bar) hydrotest
Highlights:
Installed warranty on entire system
Operating since 1996