Home > Application Data > Case Histories > Murphy Oil Medusa

Murphy Oil "Medusa"

Client: Murphy Oil
Other Partners: 25.0% ENI Petroleum, 15.0% Callon Petroleum

Details:
Truss Spar
2,223feet (678meters) water depth

Project Team:
Mustang Engineering (Engineering)
J. Ray McDermott (Shipyard)
Bay, Ltd (Piping Subcontractor)
J. Ray McDermott Middle East (Shipyard)

Installation:
Corpus Christi, TX USA (onshore)
Dubai, U.A.E. (spar-onshore)
Mississippi Canyon 582 (offshore)

FIBERBOND® Scope:
Supply of materials
Shop prefabrication
Site installation including FRP welding
Installation of supports, installation of flanges, and commissioning assistance

Systems Selected for FIBERBOND®:
Firewater, firewater deluge, seawater
7,900feet (2,408meters) of piping, up to 12" (300NB)
ABS- and USCG-type approved products
200psig (13.8bar) design, 300psig (20.7bar) hydrotest

Highlights:
FIBERBOND® selected for 6th truss spar in the Gulf of Mexico
Installed warranty on entire system
Operating since 2003