Home > Application Data > Case Histories > Mobil Chinook

Mobil "Chinook"

Client: Mobil
Other Partners:

Details:
4-pile drilling and production platform
320feet (98meters) water depth

Project Team:
Albert Garaudy & Associates (Engineering)
Twin Brothers Marine (Shipyard)

Installation:
Louisa, LA USA (onshore)
Main Pass 283 (offshore)

FIBERBOND® Scope:
Supply of materials
Shop prefabrication
Site installation including FRP welding
Installation of supports, installation of flanges, and commissioning assistance

Systems Selected for FIBERBOND®:
Firewater, firewater deluge, seawater
2,550feet (777meters) of piping, up to 12" (300NB)
ABS-type approved products
200psig (13.8bar) design, 300psig (20.7bar) hydrotest

Highlights:
Installed warranty on entire system
Operating since 1999