Client: Mobil Equatorial
Guinea
Other Partners: 23.75% Devon Energy, 5% Equatorial Guinea
Details:
Floating Production Unit (FPU)
500feet (152meters) water depth
VLCC Conversion
Project Team:
Mustang Engineering (Engineering)
Dolphin Services (Shipyard)
Delta Engineering (Shipyard)
Oceaneering Production Systems (Project Mgmt)
Installation:
Houma, LA and Channelview, TX USA (onshore)
Block B, Equatorial Guinea (offshore Bioko Island)
FIBERBOND® Scope:
Supply of materials
Shop prefabrication
Site installation including FRP welding
Installation of supports, installation of flanges, and commissioning assistance
Systems Selected for FIBERBOND®:
Firewater, firewater deluge, seawater, chemical services
3,300feet (1,005meters) of piping, up to 24" (600NB)
ABS-type approved products
200psig (13.8bar) design, 300psig (20.7bar) hydrotest
Highlights:
Installed warranty on entire system
Operating since 1997