Kerr McGee "Red Hawk"

Client: Kerr McGee
Other Partners: 50% Devon Energy

Details:
Cell Spar, 64-foot diameter hull
5,310feet (1,620meters) water depth
3 decks

Project Team:
Technip (Engineering)
Technip Offshore Inc. (Shipyard)
Harmony LLC (Piping Fabricator)

Installation:
Aransas Pass, TX USA (onshore)
Garden Banks 877 (offshore)

FIBERBOND® Scope:
Supply of materials
Shop prefabrication
Site installation including FRP welding
Installation of supports, installation of flanges, and commissioning assistance

Systems Selected for FIBERBOND®:
Firewater, firewater deluge, seawater
2,100feet (640meters) of piping, up to 12" (300NB)
ABS- and USCG-type approved products
200psig (13.8bar) design, 300psig (20.7bar) hydrotest

Highlights:
FIBERBOND® selected for 1st cell spar
Installed warranty on entire system
Operating since 2004