Home > Application Data > Case Histories > ExxonMobil Yoho

ExxonMobil "Yoho"

Client: Mobil Producing Nigeria
Other Partners: 60.0% NNPC

Details:
YA Wellhead Platform
300feet (91meters) water depth

Project Team:
Petromarine (Engineering)
Twin Brothers Marine (Shipyard)
Global Offshore International (EPC Contractor)

Installation:
Louisa, LA USA (onshore)
Yoho Field, Nigeria (offshore)

FIBERBOND® Scope:
Supply of materials
Shop prefabrication
Site installation including FRP welding
Installation of supports, installation of flanges, and commissioning assistance

Systems Selected for FIBERBOND®:
Firewater, firewater deluge, seawater
3,200feet (975meters) of piping, up to 16" (400NB)
ABS-type approved products
200psig (13.8bar) design, 300psig (20.7bar) hydrotest

Highlights:
Part of the 1st EPS (early production system) installed in west Africa
Installed warranty on entire system
Operating since 2002