Client:
ExxonMobil
Other Partners:
33.3% BP
Details:
DDCV (deep draft caisson vessel), 122-foot diameter
4,300feet (1,310meters) water depth
Project Team:
McDermott Engineering (Engineering)
Brown & Root (Shipyard)
Installation:
Greens Bayou, TX USA (onshore)
Alaminos Canyon 25/26 (offshore)
FIBERBOND® Scope:
Supply of materials
Shop prefabrication
Site installation including FRP welding
Installation of supports, installation of flanges, and commissioning assistance
Systems Selected for FIBERBOND®:
Firewater, seawater, open drains
14,400feet (4,389meters) of piping, up to 24" (600NB)
ABS- and USCG-type approved products
200psig (13.8bar) design, 300psig (20.7bar) hydrotest
Highlights:
FIBERBOND® selected for first DDCV
Installed warranty on entire system
Operating since 1999