Client:
ExxonMobil
Other Partners:
Qatar Petroleum (45%); Edison SpA (10%)
Details:
World's first offshore LNG terminal
15km offshore Porto Levante, Italy
Project Team:
Aker Kvaerner (Engineering)
Aker Kvaerner (Shipyard)
Installation:
Algeciras and Cadiz, Spain (onshore)
offshore Porto Levante, Italy (offshore)
FIBERBOND® Scope:
Supply of materials and pipe supports
Shop prefabrication
Site installation supervision of FRP welding
Commissioning assistance
Systems Selected for FIBERBOND®:
Seawater, cooling water, drains
13,700feet (4,178meters) of piping, up to 60" (1500NB)
ABS-type approved products
Up to
200psig (13.8bar) design, up to 300psig (20.7bar) hydrotest
Highlights:
World's first offshore LNG terminal
Over 400ft (122m) of custom-fabricated 60" (1500mm) piping
Delivered to Adriatic Sea in September 2008