Client:
ChevronTexaco
Other Partners: 50.0% Marathon
Details:
Compliant Tower
1,754feet (535meters) water depth
2 modules
Project Team:
W.H. Linder and Associates (Engineering)
McDermott Engineering (Engineering)
Gulf Island Fabrication (Shipyard)
J. Ray McDermott (Offshore Integration)
Installation:
Houma, LA USA (onshore)
Viosca Knoll 786 (offshore)
FIBERBOND® Scope:
Supply of materials
Shop prefabrication
Site installation including FRP welding
Installation of supports, installation of flanges, and commissioning assistance
Systems Selected for FIBERBOND®:
Firewater, seawater, waterflood, open drains,
various chemical services
16,000feet (4,876meters) of piping, up to 20" (500NB)
ABS- and USCG-type approved products
200psig (13.8bar) design, 300psig (20.7bar) hydrotest
Highlights:
Installed warranty on entire system
FIBERBOND® selected for the largest free standing structure in the world
Operating since 1998