Client:
ChevronTexaco
Other Partners:
38.38% ExxonMobil, 4.95% FINA
Details:
Classic SPAR, 122-foot diameter
2,590feet (790meters) water depth
2 decks, 3 levels
Project Team:
McDermott Engineering (Engineering)
J. Ray McDermott (Shipyard)
Aker Rauma (Hull Fabricator)
Installation:
Amelia, LA USA (onshore)
Pori, Finland (hull fabrication)
Green Canyon 205 (offshore)
FIBERBOND® Scope:
Supply of materials
Shop prefabrication
Site installation including FRP welding
Installation of supports, installation of flanges, and commissioning assistance
Systems Selected for FIBERBOND®:
Firewater, seawater, open drains
7,400feet (2,255meters) of piping, up to 20" (500NB)
ABS- and USCG-type approved products
200psig (13.8bar) design, 300psig (20.7bar) hydrotest
Highlights:
Installed warranty on entire system
Operating since 1998