Client: BP
Other Partners:
33.0% Occidental
Details:
Truss Spar, 106ft-diameter hull
5,400feet (1,645meters) water depth
Project Team:
Alliance Engineering (Engineering)
Gulf Marine Fabricators (Shipyard)
Installation:
Corpus Christi, TX USA (onshore)
Mississippi Canyon Blocks 126 and 127 (offshore)
FIBERBOND® Scope:
Supply of materials
Shop prefabrication
Site installation including FRP welding
Installation of supports, installation of flanges, and commissioning assistance
Systems Selected for FIBERBOND®:
Firewater, firewater deluge, seawater
3,000feet (914meters) of piping, up to 12" (300NB)
ABS- and USCG-type approved products
200psig (13.8bar) design, 300psig (20.7bar) hydrotest
Highlights:
FIBERBOND® selected for deepest, free-floating dry-tree system in the world
Installed warranty on entire system
Operating since 2002