Client:
BP
Other Partners:
50.0% Shell
Details:
SPAR, 149-foot diameter
4,300feet (1,300meters) water depth
4-level topsides, 3 modules
Project Team:
Mustang Engineering (Engineering)
J. Ray McDermott (Shipyard)
Bay, Ltd (Piping Subcontractor)
Installation:
Amelia, LA USA (onshore)
Green Canyon 645 (offshore)
FIBERBOND® Scope:
Replacement of failed Bondstrand piping
Supply of materials
Shop prefabrication
Site installation including FRP welding
Installation of supports, installation of flanges, and commissioning assistance
Systems Selected for FIBERBOND®:
Firewater deluge
8,000feet (2,450meters) of piping, up to 10" (250NB)
ABS- and USCG-type approved products
200psig (13.8bar) design, 300psig (20.7bar) hydrotest
Highlights:
Installed warranty on entire system
Bondstrand piping removed after 250psig design system leaked at test pressures as low as 150psig
FIBERBOND® successfully passed 300psig hydrotest
Operating since 2004