Client:
BHP Billiton Alliance Engineering (Engineering) Kiewit Offshore Services (Shipyard) Installation: Ingleside, TX (onshore) Green Canyon 653 (offshore) FIBERBOND® Scope: Supply of materials Shop prefabrication Site installation including FRP welding Installation of supports, installation of flanges, and commissioning assistance Systems Selected for FIBERBOND®: Seawater, firewater, drains 20,995feet (6,399meters) of piping, up to 16" (400NB) ABS and USCG type approved products Up to 200psig (13.8bar) design, up to 300psig (20.7bar) hydrotest Highlights: Largest ever Modec-Moses design TLP Installed warranty on entire system Scheduled for operation in 2009
|
||||||||
|
||||||||